Padel courts design and installation require a combination of expertise, quality materials, and compliance with international standards. With Italgreen’s Official FIP solutions, sports centers and clubs can expect top-tier courts that meet the needs of both players and spectators. Explore our range of customizable courts and learn more about the design, project, and installation process:
For more information, please visit our website.
Italgreen offers high-quality padel courts designed to provide an excellent playing experience. Through a partnership with the Spanish company Mejor Set, Italgreen combines Italian craftsmanship with Spanish expertise to design and install courts that meet the highest international standards. Discover our Official FIP (International Padel Federation) solutions and customize your court with our expertise.
The Full Panoramic padel court by Italgreen is designed to offer a completely transparent experience, allowing for optimal visibility for both players and spectators. This design focuses on high-quality materials and a seamless structure, ensuring a modern look and functionality that matches international standards. Perfect for clubs looking to host professional matches or showcase events, this court is a top-tier choice for any padel facility.
The Panoramic padel court also features an open and visually appealing structure but with a slight variation in design from the Full Panoramic model. While maintaining transparency, this court ensures a professional-level experience with high-strength materials and customizable features. Its adaptable design makes it suitable for all levels of play, from amateur to professional tournaments.
The V-PRO model brings the ultimate in padel court design, combining durability and performance. Engineered with precision, it meets FIP standards and includes the latest innovations in padel court technology. The V-PRO is ideal for sports centers seeking a robust yet high-performing court that guarantees great playability and long-lasting quality.
Italgreen provides endless customization options to make your padel court design unique:
Whether you need a single court for training or multiple courts for a large sports facility, Italgreen provides tailored solutions to fit your requirements.
Ready to take your sports facility to the next level?
Contact us now
The process of setting up a padel court involves several stages, and Italgreen guides clients through each step:
The initial phase is about analyzing all constraints:
This step concludes with a commercial offer and an initial design outline.
Do I Need a Permit?
Yes, padel courts are considered constructions and require permits from local authorities. The type of permit varies by municipality and must be handled by a licensed professional.
Does Italgreen Handle Permits?
Clients are responsible for obtaining permits with the assistance of a licensed professional. Italgreen provides support by supplying the necessary materials and documentation to facilitate the process.
With competitive price and timely delivery, padelcourtfactory sincerely hope to be your supplier and partner.
During this phase, professional technicians prepare the following project documentation:
This stage ends with a signed contract and confirmed order.
What Is the Minimum Space Needed?
A single padel court requires a minimum free space of 20.50m x 10.50m, with the foundation occupying 21m x 11m (or 21m x 14m if technical areas are included).
Can Two Courts Be Joined?
Due to the nature of padel, where walls are an integral part of play, courts cannot be joined without leaving at least a 10 cm gap between them.
Is My Existing Slab Usable?
The appointed technician will need to verify if the existing foundation meets the structural requirements for installing a padel court.
Once the project is approved and permits are in place, construction begins:
The process concludes with a work completion report.
What Are the Construction Steps?
Steps include site preparation, slab formation with electrical conduit placement, concrete pouring, and padel court installation.
What Is the Time Frame for Installation?
Installation of the court structure is quick, usually taking 3-5 days. However, the concrete foundation requires about 28 days to reach full strength.
The final step includes collecting all necessary documentation to start using the court:
Is the Padel Court Certified by the FIP?
Yes, Italgreen's padel courts meet FIP construction standards and can be officially certified upon request.
Choosing Italgreen means opting for quality synthetic turf specifically designed for padel courts. Here are the benefits:
Ready to take your sports facility to the next level?
Contact us to discuss your requirements of Super Power panoramic padel court. Our experienced sales team can help you identify the options that best suit your needs.